Plains at Parish |
|
|
|

In 2009 Anytime Excavating, Inc began work on:
Site Development of an Adult Community offering Independent Living, Assisted Living, and Memory Care. The 31 acre Community consists of 39 patio homes, 107 apartments, Wellness Center and shops; with a total construction cost of over $22,000,000.
Our Scope of Work included:
- Erosion Control
- Site Grading
- Site Utilities
- Storm Sewer Systems
- Municipal Water Systems
- Trenching/Backfill for Site Lighting
- Concrete Curbing
- Roadways
- Sidewalks
|
|
Cortland College Suites |
|
|
|

On 8/3/08 Anytime Excavating, Inc began work on:
New site development for commercial apartment housing specifically constructed for Undergraduate housing. Two (2) new four (4) story buildings, housing 720 beds with an overall project value of $21,000,000.
Our Scope of Work included:
- Demolition and removal of existing buildings and trees
- Install building insulation at foundation
- Install vapor barrier
- Mechanical and electrical excavation/backfill
- All SOG prep work
- Asphalt paving, concrete curb and sidewalks
- All parking lot prep work
- All site clearing, all site utilities, parking lot striping
- Excavation and backfill all foundations
- Clean up including sweeping and taking debris to dumpster
- Coordination with other contractors
- Maintain the construction schedule
|
|
Corning Children’s Center |
|
|
|

On 3/24/2008 Anytime Excavating, Inc began work on:
New Construction of an 11,000sf building with a total construction cost of over $1,200,000. The Center can accommodate up to 144 children with age specific classrooms build from a "childs perspective"
Our Scope of Work included:
- Site demo, clear & grub
- Tree protection
- Temporary construction entrance
- Erosion control
- SWPPP Requirements
- Building excavation/backfill
- Site electrical excavation/backfill light pole bases
- Paving area prep
- Site concrete prep
- Sidewalk prep
- Granite or concrete curb prep
- Dry stream bed sub-grade prep
- Under slab excavation/backfill for plumber
- Foundation insulation & vapor barrier
- Under slab drain piping
- Storage shed
- Water & storm sewer
- Topsoil
- Flagging and traffic control
|
|
Ithaca College Gateway Building |
|
|
|

In 2008 Anytime Excavating, Inc began work on:
New Construction of a four (4) story, 58,000sf building, with a total construction cost of over $21,500,000 that obtained LEED Gold Certification. The building houses offices of: Enrollment Planning, Human Resources, Graduate Studies, Senior Administration, Admissions, BUSAR and Registration.
Our Scope of Work included:
- Erosion Control
- Excavation/Backfill Footers/Foundations
- Excavation/Installation/Backfill:
- Asphalt Parking Lots
- Asphalt Drives
- Asphalt Sidewalks
- Concrete Sidewalks
- Concrete Plaza
- Concrete Vent Structure
- Granite Curbing
- Storm Sewer Systems
- Municipal Water
- Underground Utilities
- Site Grading
|
|
Top of the Hill Apartments |
|
|
|

On 8/8/2007 Anytime Excavating, Inc began work on:
A four (4) story rental apartment building with full basement, situated on a .75 acre lot.
Our Scope of Work included:
- Excavation included:
- Erosion control
- Excavation & backfill of new basement area
- Excavation & backfill of new slab on grade
- Excavation & backfill of new curb
- Excavation & backfill of new sidewalks
- Excavation & backfill of new light poles
- Excavation & backfill of site utilities
- Supply & install 4" sock drain for perimeter drain piping
- Supply & install all structural backfill for foundations & frost walls
- Supply & install item #4 sub-base material for:
- Sidewalks
- New parking area to include geotech fabric
- New transformer pad
- New curbing as indicated
- New basement slab & new slab on grade
- Supply & install 6" topsoil in new green areas
- Site utility excavation included:
- Trench & backfill for new water service, electrical, storm & sanitary sewer 5' from building
|
|
KwikFill Gas Station |
|
|
|

In 2007 Anytime Excavating, Inc began work on:
New commercial site, approximately 20,770sf, providing sales of gasoline and various "convenient" items.
Our Scope of Work included:
- Demolition and removal of existing asphalt paving and buried utilities.
- Excavation and removal of contaminated soils and sub-soils
- Erosion Control
- Excavation and Installation of:
- Sidewalks
- Parking lots
- Driveways
- Lawn areas
- Curbing
- Building pad/foundations
- Utilities
- Storm sewer
- Municipal Water
- Store building construction
|
|
Dryden Town Hall |
|
|
|

On 8/23/06 Anytime Excavating, Inc began work on:
New Construction of Municipal Building, approximately 11,680sf, situated on 5 acres. Building houses offices of: Town Court, Town Code Enforcement, Recreation Department, Environmental Engineering Office, Town Supervisor and Department of Public Works.
Our Scope of Work included:
- Cut topsoil for building area
- Erosion & sediment control
- Furnish & install bank run gravel fill for elevation for building
- Excavation for frost wall & interior wall for building
- Furnish & install item #4 gravel for backfill frost walls
- Retention pond
- Install storm
- Driveway & parking lot cuts
- Furnish & install 12" of item #4 gravel sub-base under driveway & parking lot areas
- Furnish & install 6" of item #4 gravel sub-base under slab for building
- Plumber interior trenching & backfill
- Furnish & install 8" ductile waterline with permits, taps, fees, chlorination test & 24" boring under rte. 392
- Furnish & install fill behind retaining walls
- Sidewalk & curb prep
- Site grading
- Electrical & light pole trenching & backfill
- Sanitary
|
|
Rite Aid Pharmacy Store |
|
|
|

On 5/8/2006 Anytime Excavating, Inc began work on:
New construction of a one story, 14564sf, Retail and Pharmaceutical store, situated on 3 acres.
Our Scope of Work included:
- Parking lot layout, grades & stake-out
- Curb layout, grades & stake-out
- Excavation/backfill:
- Building foundations
- Curbs
- Sidewalks
- dumpster pad & loading dock
- Site grading adjustments-cuts to fill
- Detention ponds construction with outflow pipe, rip-rap, filter fabrics
- All site storm drain piping & structures, loading dock & drain pipe
- All water, sewer, complete to 5'-0" out of building
- Provide excavation/backfill for electrician's conduits, phone, cable, light poles & conduits, trenching & electrical service
- Furnish all specified sub-base materials for parking lot, building pads, sidewalks, Mirafy fabric & fine grades
- Furnish all topsoil complete site, rough grade only
- Furnish balance of removals of blacktop & construction
- Road; restore to new condition
- Furnish all erosion control measures & maintain throughout project duration
- Furnish safe access around building for all trades
|
|
RPM Ecosystems Dryden Nursery |
|
|
|

On 12/26/06 Anytime Excavating, Inc began work on:
A 160 acre commercial site specializing in accelerated growth of 240 genetically modified Native Tree Species. This site contains a 15 acre "modified gravel" planting field with an underground irrigation system, provided by 2.5 acre pond, as well as multiple Greenhouses and Production buildings.
Our Scope of Work included:
- Erosion Control
- Clear and Grubbing of Site
- Site Grading
- Excavation & Installation of:
- Roadways
- Parking areas
- Recreation areas
- Planting fields
- Irrigation Pond
- Irrigation Systems
- Storm Sewer
- Underground Utilities
- Building Pads
|
|
|
|
|
|
|